This new 6,383 m2, single-story school was constructed on the site of the old Gander Academy and incorporated the gymnasium of the original school. The building can accommodate approximately 540 students.
Marco’s contract included the construction of 29 classrooms, a library, music rooms, an administration area, cafeteria, and kitchen; the renovation of the existing gym for connection to the new building; the redevelopment of the parking lot; and the demolition of the existing building.