This 1,197-square-meter facility will be net-zero carbon ready. It uses energy efficient building systems and heavy timber construction. Gluelam beams are used for the structure and cross-laminated timber for the roof and walls. The building is being constructed adjacent to the existing operational facility, which no longer meets the needs of the detachment. Construction is scheduled to be complete by November 2023.